Review Assessment Report

Part 1: Contact & Program Identification

Report Year and Contact Information
Academic YearModified ByDate Modified
2020-2021swilson97@cnm.edu2021-11-30T19:26:14.348Z
SchoolName of ProgramCourses
BITComputer Information AAS Degree: Network AdministrationCIS 1680,BCIS 1110,CIS 2450,CIS 1410,CIS 2424,CIS 1610,CIS 2421,CIS 1425,CIS 2427,CIS 2999,CIS 1415,CIS 2426,BUSA 1110,BUSA 1130,COMM 2120

Part 2: Program Summary

Provide a high level review of the program to include highlights, successes, challenges, significant changes, and significant resources needed to support the program
The Network Administration AAS experienced a decrease in the number of graduates and declared majors compared to the previous year.

Part 3: Data Review

2018-20192019-20202020-2021
Annual number of graduate awards is greater than 1018124
Number of declared majors1298573
Average Class Size22.921.821.3
Annual Average Class withdrawal rate is 30% or below (SAGE 35%)11%13%11%
Annual C-Pass rate for coursework is 60% or above76%74%71%
Average class fill rate at 60% or above capacity within a term or over a year78%74%75%
Graduate Transfer to 4-year Schools17%17%n/a
Full-time Faculty Coverage by Section51%56%64%
Summarize how your program met or did not meet the target measures based on the data above
There were 4 graduates for 2020-2021, which did not exceed the target of 10 graduates for AAS program. The average class fill rate was 75% exceeding the 60% target. The annual retention rate was 89% exceeding the 70% target. The C-pass rate was 71% exceeding the 60% target.

Part 4: Program Learning Outcome Analysis

Learning OutcomePopulation or Course(s) AssessedDescriptionSummary of Assessment Results
Demonstrate network mathematical literacy both in theory and application as it applies to networks.
CIS 2999
  • Capstone Project
Target: At least 70% of students will be able to successfully demonstrate subnetting a network and application of device configurations. Outcome: Target met. 100% of students tested were able to successful demonstrate ability to subnet a network and apply to configuration of live network.
Demonstrate problem solving ability with data networks.
CIS 2999
  • Capstone Project
Target: At least 70% of students tested will be able to troubleshoot a network. Outcome: Target met. 75% of students were able to troubleshoot issues after configuration of a network.
Demonstrate the practical application of skills needed to design, implement, and support network security.
CIS 2999
  • Capstone Project
Target: At least 70% of students tested will be able to implement network security. Outcome: Target met. 75% of students were able to implement network security after configuration of a network.
Design, address, construct and test LANs containing multiple VLANs as well as wireless devices.
CIS 2999
  • Capstone Project
Target: At least 70% of students tested will be able to successfully implement VLANs and appropriate network protocols. Outcome: Target met. 75% successfully implemented VLANs after basic configuration of the network and appropriate network protocols.
Design, address, construct and test WAN topologies selecting from current networking technologies.
CIS 2999
  • Capstone Project
Target: At least 70% of students tested will be able to successfully design, implement and test and network using appropriate utilities. Outcome: Target met. 100% of students successfully designed, implemented and tested a network using appropriate utilities.
Develop a logical diagram and translate it to a physical implementation.
CIS 2999
  • Capstone Project
Target: At least 70% of tested students will be able to develop and implement network diagrams using appropriate software. Outcome: Target met. 100% of students were able to develop network diagrams using appropriate software and apply to a physical network implementation.
Employ basic cabling and network designs to connect devices in accordance with stated objectives.
CIS 2999
  • Capstone Project
Target: At least 70% of students tested will be able to successfully connect devices using a network diagram. Outcome: Target met. 100% of students were able to successfully connect devices as presented in a network diagram.
Use network protocol models to explain the layers of communications in data networks.
CIS 1425
  • Test or Quiz
Target: At least 70% of students were able to demonstrate understanding of the OSI model. Outcome: Target met. 100% of students were able to explain the OSI model.
Interpretation of Assessment findings
Overall, students were able to implement and test networks for issues after configuration. However, 25% of students were challenged in the area of troubleshooting.

Part 5: Additional Action Plan in Support of Student Learning (If Appropriate)

Upcoming YearChanges Planned for the upcoming yearData Motivating this change
2021-2022
For the 2021-2022 courses will be offered in a hybrid format to ensure students are able to receive in-person assistance.
Students performed well in an online overall, however students may benefit from a face-to-face modality to help overcome difficulty with some technical areas.
2021-2022
2021-2022
Please select all of the following that characterize the types of changes described in the above action plan
2021-2024 CNM - Digital Services
Site version v1.0.62 built at 2024-02-01T17:31:19.000Z